Duet3D Logo Duet3D
    • Tags
    • Documentation
    • Order
    • Register
    • Login

    Limit Tuning Cycles on M303

    Scheduled Pinned Locked Moved
    Firmware wishlist
    2
    2
    133
    Loading More Posts
    • Oldest to Newest
    • Newest to Oldest
    • Most Votes
    Reply
    • Reply as topic
    Log in to reply
    This topic has been deleted. Only users with topic management privileges can see it.
    • lee7670undefined
      lee7670
      last edited by

      Hi, for various reasons, I have had a couple tuning cycles that have taken >1.5 hours. Would it be possible to limit how many cycles it can perform or what the threshold for convergence is?
      I am on 3.2 release.

      1 Reply Last reply Reply Quote 0
      • Phaedruxundefined
        Phaedrux Moderator
        last edited by Phaedrux

        The new algorithm is geared for accuracy rather than speed. 1.5 hours may actually be pretty short compared to that on a very large thick bed. Best to just leave it do what it needs to do?

        Z-Bot CoreXY Build | Thingiverse Profile

        1 Reply Last reply Reply Quote 1
        • First post
          Last post
        Unless otherwise noted, all forum content is licensed under CC-BY-SA