Duet3D Logo Duet3D
    • Tags
    • Documentation
    • Order
    • Register
    • Login

    DWC Reports NA for Time Estimates

    Scheduled Pinned Locked Moved
    Duet Web Control wishlist
    1
    1
    434
    Loading More Posts
    • Oldest to Newest
    • Newest to Oldest
    • Most Votes
    Reply
    • Reply as topic
    Log in to reply
    This topic has been deleted. Only users with topic management privileges can see it.
    • BMMalundefined
      BMMal
      last edited by

      This is somewhat tied to the thread I created on the Firmware side. https://www.duet3d.com/forum/thread.php?id=2237

      DWC should not report NA for the time remaining estimates once the filament used has met or surpassed the total reported for the print. DWC should still be able to calculate estimated time remaining based on layer time and file progress. It seems that the Firmware already does this properly as it gives an estimate on the Panel Due based on layer time and file progress.

      Duet Ethernet - Most likely the most recent Edge firmware
      Duet X5
      7" Panel Due V2
      Cartesian, 4 Nozzles with Flex3Drives, Heated Chamber, Simple Switch Filament Sensing

      1 Reply Last reply Reply Quote 0
      • First post
        Last post
      Unless otherwise noted, all forum content is licensed under CC-BY-SA