Duet3D Logo Duet3D
    • Tags
    • Documentation
    • Order
    • Register
    • Login

    M109 implementation

    Scheduled Pinned Locked Moved
    General Discussion
    2
    2
    484
    Loading More Posts
    • Oldest to Newest
    • Newest to Oldest
    • Most Votes
    Reply
    • Reply as topic
    Log in to reply
    This topic has been deleted. Only users with topic management privileges can see it.
    • pcsentinelundefined
      pcsentinel
      last edited by

      How is M109 implemented?

      If I want to wait until a tool is cooled to a temperature can I use the R setting? i.e.:
      M109 S190 wait until extruder reaches 190 deg
      M109 R170 wait until extruder cools to 170 deg

      1 Reply Last reply Reply Quote 0
      • dc42undefined
        dc42 administrators
        last edited by

        Yes, that works in recent firmware versions.

        Duet WiFi hardware designer and firmware engineer
        Please do not ask me for Duet support via PM or email, use the forum
        http://www.escher3d.com, https://miscsolutions.wordpress.com

        1 Reply Last reply Reply Quote 0
        • First post
          Last post
        Unless otherwise noted, all forum content is licensed under CC-BY-SA