Duet3D Logo Duet3D
    • Tags
    • Documentation
    • Order
    • Register
    • Login

    Wiring power switch tail on Duet 2 WiFi

    Scheduled Pinned Locked Moved
    Duet Hardware and wiring
    1
    1
    110
    Loading More Posts
    • Oldest to Newest
    • Newest to Oldest
    • Most Votes
    Reply
    • Reply as topic
    Log in to reply
    This topic has been deleted. Only users with topic management privileges can see it.
    • JoostvWundefined
      JoostvW
      last edited by

      Dear all,

      In our company we have a 3D printer running with a heated bed which is sepererately from the control interface (Duet 2 WiFi). You can already guess that the heatbed keeps running when the prints finishes, resulting is an enormous energy losses (heatbed is > 1kW).

      The idea is to use this powerswitchtail (https://shop.mchobby.be/en/breakout/1289-power-switch-tail-240v-ac-3232100012899.html) to switch off the heatbed when the print is finished, with the M80/M81 gcodes with the PS-on connections on the duet. However, not sure how to wire (some say PS-on is an input for 5V, other say it's an output) this and set it up. Hopefully you can shine some light on it.

      Wiring idea;
      From Duet 5V --> + on Powerswitchtail
      Duet PS-on --> GND on powerswitchtail

      Thanks a lot in advance!

      1 Reply Last reply Reply Quote 0
      • First post
        Last post
      Unless otherwise noted, all forum content is licensed under CC-BY-SA