Duet3D Logo

    Duet3D

    • Register
    • Login
    • Search
    • Categories
    • Tags
    • Documentation
    • Order

    Limit switch test..

    General Discussion
    2
    3
    559
    Loading More Posts
    • Oldest to Newest
    • Newest to Oldest
    • Most Votes
    Reply
    • Reply as topic
    Log in to reply
    This topic has been deleted. Only users with topic management privileges can see it.
    • vbtalent
      vbtalent last edited by

      First post on the forum… I'm just getting my CoreXY going and wanted to test the limit switches but don't see any feedback on the control panel when tripping a switch.

      The boards 3.3v indicates with a green light so I assume polarity/connectivity is correct.

      How do I test the limit switches?

      Thanks.

      VB,

      1 Reply Last reply Reply Quote 0
      • dc42
        dc42 administrators last edited by

        Two ways:

        1. In Duet Web Control go to Settings -> Machine Properties. That page shows the status of the switches, delayed by a fraction of a second.

        2. Send M119 from any input source and it will return the current status.

        Duet WiFi hardware designer and firmware engineer
        Please do not ask me for Duet support via PM or email, use the forum
        http://www.escher3d.com, https://miscsolutions.wordpress.com

        1 Reply Last reply Reply Quote 0
        • vbtalent
          vbtalent last edited by

          Perfect thanks.

          Appreciate the quick response.

          VB,

          1 Reply Last reply Reply Quote 0
          • First post
            Last post
          Unless otherwise noted, all forum content is licensed under CC-BY-SA