Duet3D Logo

    Duet3D

    • Register
    • Login
    • Search
    • Categories
    • Tags
    • Documentation
    • Order

    Dual Z motor Homing with dual switches

    Duet Hardware and wiring
    1
    2
    546
    Loading More Posts
    • Oldest to Newest
    • Newest to Oldest
    • Most Votes
    Reply
    • Reply as topic
    Log in to reply
    This topic has been deleted. Only users with topic management privileges can see it.
    • LeonMF
      LeonMF last edited by

      I've got a Promega from M3D running a Duet Maestro controller.

      I've completely redesigned the Z axis motion system and now have dual Z lead screws. I know that, as of 1.19 I can use the z-probe to auto level but I'd like to treat this similar to a gantry axis on a CNC where there is a limit switch per axis.

      As a result, I've attempted to use the method outlined here:
      https://betrue3d.dk/duet-wifieth-use-m584-to-autolevel-or-sync-z-axis-using-2-or-more-motors/

      It mostly works but I need to stop the axis that hits it's limit first and let the second axis continue. until it hits its limit switch. Is this possible without having to perform separate axis commands and deliberately twisting my bed a bit?

      Thanks0_1545611114254_homez.g

      Current: Railcore II ZLT w/Duet 3 and Hemera hot end.
      Retired: Robo3D R1,BI V2.5 Delta updated to BerryBot magnets, bespoke carriages and Duet Ethernet, M3D Promega;

      1 Reply Last reply Reply Quote 0
      • LeonMF
        LeonMF last edited by

        Never mind. It works. It helps to have the correct limit switch assigned to the correct motor!

        Current: Railcore II ZLT w/Duet 3 and Hemera hot end.
        Retired: Robo3D R1,BI V2.5 Delta updated to BerryBot magnets, bespoke carriages and Duet Ethernet, M3D Promega;

        1 Reply Last reply Reply Quote 0
        • First post
          Last post
        Unless otherwise noted, all forum content is licensed under CC-BY-SA