• Tags
  • Documentation
  • Order
  • Register
  • Login
Duet3D Logo Duet3D
  • Tags
  • Documentation
  • Order
  • Register
  • Login

Delay standby temperature at toolchange?

Scheduled Pinned Locked Moved
Tuning and tweaking
2
2
156
Loading More Posts
  • Oldest to Newest
  • Newest to Oldest
  • Most Votes
Reply
  • Reply as topic
Log in to reply
This topic has been deleted. Only users with topic management privileges can see it.
  • undefined
    TypQxQ
    last edited by 18 Dec 2021, 21:45

    Hello!

    I run a toolchanger with only different colors of PLA right now.
    For a small object the tool can be in action for just a couple of seconds for maybe a couple of layers and then change back to the other one and in between maybe not used for a 10 minutes.

    Is there a way to delay putting the tool in Standby temperature for like 15 seconds from it being deactivated?

    Using e3d Revo betas and heat up times are fast but so are the cooldown times.

    I was thinking of using global variables and daemon.g but it might be overcomplicating things.

    undefined 1 Reply Last reply 19 Dec 2021, 08:43 Reply Quote 0
    • undefined
      o_lampe @TypQxQ
      last edited by 19 Dec 2021, 08:43

      @typqxq
      If I understood it right, the multi-gcode streaming feature has the goal to extend look-ahead and allow better temp control for toolchangers. (mainly switching the heaters ON, before toolchange is due)
      I guess, this would also help you with your problem?

      Unfortunately it'll be RRF3.5 until we see this feature.

      1 Reply Last reply Reply Quote 0
      1 out of 2
      • First post
        1/2
        Last post
      Unless otherwise noted, all forum content is licensed under CC-BY-SA