    Beta testers for multiple motion system support

    Scheduled Pinned Locked Moved
    Beta Firmware
    21
    70
    7.5k
    Loading More Posts
    • Oldest to Newest
    • Newest to Oldest
    • Most Votes
    Reply
    • Reply as topic
    Log in to reply
    This topic has been deleted. Only users with topic management privileges can see it.
    • dc42undefined
      dc42 administrators @bot
      last edited by dc42

      Thanks for all who have responded. I may be able to provide a first build of RRF with dual motion system by this Friday. This version will have some limitations:

      • The two motion systems must share a common Z axis
      • Standalone mode only (not SBC mode)
      • Resume-after-power fail will not be supported
      • Simulation mode may not be supported
      • Pause/resume may not be fully implemented
      • There will be no attempt to predict collisions between the two print heads, so the GCode commands must avoid potential collisions
      • There will be no checking that commands for different motion systems don't attempt to drive the same axis simultaneously
      • No mesh bed compensation

      It's time to think about preparing GCode files that case use both motion systems. There is some documentation at https://docs.duet3d.com/en/User_manual/RepRapFirmware/Multiple_motion_systems on how the different motion systems are addressed in GCode.

      The simplest way to use the two motion systems is probably to load two objects on the build plate in your slicer and space them far enough apart so that they can be printed independently by your two motion systems without collisions. Then change the GCode file produced by the slicer so that the commands for one object are assigned to motion system 0 (by using the M596 P0 command before a block of commands for that motion system) and commands for motion system 1 are assigned to motion system 1 (using M596 P1 before a block of commands for that motion system).

      You will need to add a M400 command to sync the motion systems before and after each G1 Z command that does a layer change. Obviously you cannot use Z hop on travel moves. Don't let the blocks of contiguous commands for one motion system get too long, or the other motion system might pause for a short while as it skips the block.

      You will need to select one tool for each motion system at the start. One of those tools should map the X and Y axes to the corresponding axes of your second motion system, for example U and V.

      In the future I hope we will be able to do the splitting of objects into multiple motion systems either in the slicer, or in a standard post-processing script.

      Duet WiFi hardware designer and firmware engineer
      Please do not ask me for Duet support via PM or email, use the forum
      http://www.escher3d.com, https://miscsolutions.wordpress.com

      o_lampeundefined 2 Replies Last reply Reply Quote 2
      • o_lampeundefined
        o_lampe @dc42
        last edited by

        @dc42
        That'll be exciting to try!
        You should also mention that mesh leveling must not be enabled.

        I wonder, how a waiting tool behaves when layer times are way different? Will it go in parking position or just sit and wait for the other tool to finish the layer? Will it automatically retract/unretract?

        1 Reply Last reply Reply Quote 0
        • o_lampeundefined
          o_lampe @dc42
          last edited by o_lampe

          @dc42 said in Beta testers for multiple motion system support:

          There will be no checking that commands for different motion systems don't attempt to drive the same axis simultaneously

          How do we address layer changes then? Isn't Z-axis a common axis of both systems? Do we need to define a third tool just for the z-axis and switch to that tool before layer change?
          Putting M400 before a layer change will only wait for the other tool to empty the print queue, but it's not guaranteed to be finished with the layer...

          dc42undefined 1 Reply Last reply Reply Quote 0
          • dc42undefined
            dc42 administrators @o_lampe
            last edited by dc42

            @o_lampe said in Beta testers for multiple motion system support:

            @dc42 said in Beta testers for multiple motion system support:

            There will be no checking that commands for different motion systems don't attempt to drive the same axis simultaneously

            How do we address layer changes then? Isn't Z-axis a common axis of both systems? Do we need to define a third tool just for the z-axis and switch to that tool before layer change?
            Putting M400 before a layer change will only wait for the other tool to empty the print queue, but it's not guaranteed to be finished with the layer...

            When multiple motion systems are in use, M400 causes them to synchronise at that point, i.e. no motion system proceeds past that M400 until all motion systems have finished executing it.

            Only one motion system needs to move the Z axis to do the layer change. Another M400 command after that Z move will ensure that the other motion system waits for it to complete.

            @o_lampe said in Beta testers for multiple motion system support:

            I wonder, how a waiting tool behaves when layer times are way different? Will it go in parking position or just sit and wait for the other tool to finish the layer? Will it automatically retract/unretract?

            Currently it will just sit there. In the future I will add an option to park waiting tools, probably by using an extra parameter on M400. Meanwhile you could call a parking macro just before the M400.

            Duet WiFi hardware designer and firmware engineer
            Please do not ask me for Duet support via PM or email, use the forum
            http://www.escher3d.com, https://miscsolutions.wordpress.com

            1 Reply Last reply Reply Quote 1
            • botundefined
              bot
              last edited by bot

              I will begin work shortly preparing a rudimentary minimally-viable custom PrusaSlicer build to support concurrent printing of multiple objects. So far, the plan would be to copy and modify the sequential object printing feature to interleave the two object g-codes instead of outputting them sequentially. M596 and M400 would be emitted when needed. Is there anything else that would be required or helpful to get started testing this? At first, time estimates and other helpful features would not work.

              *not actually a robot

              o_lampeundefined 1 Reply Last reply Reply Quote 4
              • o_lampeundefined
                o_lampe @bot
                last edited by

                @bot
                I thought from the beginning, that such a project can only be done with a slicer-dev in coop.

                Interleaving the two objects has it's charm, but there is also the problem with unequal path length (or path print duration to be exact).
                You'd have to chop (straight) path' into equal portions to make sure, both nozzles are finished at the same time.
                A waiting tool at the end of a layer is one thing, but a waiting tool at the end of every path is another.

                It would be cool, if you could slow down the nozzle of the object with the slightly smaller layer-area, to make them both fotofinish the layer.

                dc42undefined botundefined 2 Replies Last reply Reply Quote 0
                • dc42undefined
                  dc42 administrators @o_lampe
                  last edited by

                  @o_lampe when printing multiple objects, it should only be necessary for the two motion systems to synchronise at the end of each layer and again after the Z move, provided the objects are separate sufficiently for there to be no risk of collision of the two tool heads.

                  Duet WiFi hardware designer and firmware engineer
                  Please do not ask me for Duet support via PM or email, use the forum
                  http://www.escher3d.com, https://miscsolutions.wordpress.com

                  1 Reply Last reply Reply Quote 0
                  • botundefined
                    bot @o_lampe
                    last edited by

                    @o_lampe Yes, certainly it would be nice to have the speeds of moves automatically adjust, if requested. However, I'm still trying to ort out a way to use the time estimates in such a way. So, for now, I'm going to try and get a quick-and-dirty test build up, so testers can have a bit of help. It doesn't seem, to me, like there is an easy way to interleave two object g-codes, besides with a slicer or script. But, if there was a script or method to easily achieve the quick-and-dirty interleave, I could focus more time and effort on the coordinated timing, etc., and skip the mvp... it's up to the testers really, which they would prefer.

                    *not actually a robot

                    dc42undefined T3P3Tonyundefined 2 Replies Last reply Reply Quote 0
                    • dc42undefined
                      dc42 administrators @bot
                      last edited by

                      Unfortunately I don't have a test build ready yet, and I now have to stop working on this feature. I will return to it later this month.

                      Duet WiFi hardware designer and firmware engineer
                      Please do not ask me for Duet support via PM or email, use the forum
                      http://www.escher3d.com, https://miscsolutions.wordpress.com

                      1 Reply Last reply Reply Quote 1
                      • T3P3Tonyundefined
                        T3P3Tony administrators @bot
                        last edited by

                        @bot @dc42 Is there an "optimal" amount of interleaving?

                        At one extreme having a line addressed to one motions, followed by a line addressed to the other motion stream, then back to the first does not appear good due to the overhead of switching the addressing and also because frequently the motion systems would not be that closely synchronised - one may be doing long moves and the other short ones.

                        At the other extreme it would be a layer at a time.

                        If both motion streams are reading the SD card file independently then presumably there is quite a lot of flexibility in this?

                        www.duet3d.com

                        botundefined dc42undefined 2 Replies Last reply Reply Quote 1
                        • botundefined
                          bot @T3P3Tony
                          last edited by

                          @t3p3tony This is a good point. An idea that just came to mind is to use the approximate length of the move queue. iirc, about 40-60 moves? Or perhaps, half the move queue? There might be some logic behind the number of lines to send to each system. I'm open to ideas. Perhaps I will make it configurable at first, by the user.

                          *not actually a robot

                          1 Reply Last reply Reply Quote 0
                          • dc42undefined
                            dc42 administrators @T3P3Tony
                            last edited by

                            @t3p3tony I suggest around 10 to 30 commands before switching to the other stream. This keeps the overhead of reading and processing M597 commands reasonable low, without having very large blocks for the other GCode processor to skip over which could cause stuttering.

                            Duet WiFi hardware designer and firmware engineer
                            Please do not ask me for Duet support via PM or email, use the forum
                            http://www.escher3d.com, https://miscsolutions.wordpress.com

                            1 Reply Last reply Reply Quote 1
                            • o_lampeundefined
                              o_lampe
                              last edited by

                              For me it's obvious, that in the future the SBC will play a major role in this.
                              I know, it's not in the scope yet, but why not start the project with that in mind?

                              If we had a way to merge two gcode files into one SBC-stream, we would also overcome the RAM limitations of Duet2.
                              I'm sure the Klipper guys would go that way. I already regret mentioning that, sorry.

                              dc42undefined 1 Reply Last reply Reply Quote 0
                              • oliofundefined
                                oliof
                                last edited by oliof

                                I don't see a single threaded non-realtime process (and I don't even want to start consider multiple threads or processes...) being reliably able to emit interleaving gcode that requires cooperation. So I am not sure the SBC will be a help here.

                                <>RatRig V-Minion Fly Super5Pro RRF<> V-Core 3.1 IDEX k*****r <> RatRig V-Minion SKR 2 Marlin<>

                                o_lampeundefined 1 Reply Last reply Reply Quote 0
                                • o_lampeundefined
                                  o_lampe @oliof
                                  last edited by

                                  @oliof
                                  You think of a real-time process, but I believe the pre-processing can take place in such short time, that it's done before the bed is heated.

                                  I've seen it on my K40 laser: the controller is dumb with no memory. A raster-file or vector-graphics are fully controlled by the PC or a RasPi400 in my case. Although it's written in python, which only uses one CPU-core, it's fast ( upto 500mm/s raster engraving) and reliable.

                                  oliofundefined 1 Reply Last reply Reply Quote 0
                                  • oliofundefined
                                    oliof @o_lampe
                                    last edited by

                                    @o_lampe slight deviations are not a problem as long as you have a single tool. Coordinated moves from independent streams are another story.

                                    <>RatRig V-Minion Fly Super5Pro RRF<> V-Core 3.1 IDEX k*****r <> RatRig V-Minion SKR 2 Marlin<>

                                    1 Reply Last reply Reply Quote 0
                                    • dc42undefined
                                      dc42 administrators @o_lampe
                                      last edited by

                                      @o_lampe we are already planning to use one SBC controlling multiple Duets to implement larger numbers of concurrent motion systems. For example, one SBC controlling two or three Duets, each of which controls two or three motion systems.

                                      Duet WiFi hardware designer and firmware engineer
                                      Please do not ask me for Duet support via PM or email, use the forum
                                      http://www.escher3d.com, https://miscsolutions.wordpress.com

                                      1 Reply Last reply Reply Quote 2
                                      • wiegoundefined
                                        wiego
                                        last edited by

                                        @dc42 I have built the latest 3.5-dev RRF. M596 is accepted. But I can't get asynchronous motion running. It doesn't start the second (P1) motion system and waits forever.
                                        What I am trying to do is simply running X and Y asynchronously.

                                        Could you please provide an example?

                                        dc42undefined 1 Reply Last reply Reply Quote 0
                                        • dc42undefined
                                          dc42 administrators @wiego
                                          last edited by

                                          @wiego unfortunately I had to pause work on multiple motion system support due to other pressing work. The current state is that multiple motion systems won't work in SBC mode, but might work in standalone mode. However, pause and resume will not work because the changes have not been completed.

                                          Duet WiFi hardware designer and firmware engineer
                                          Please do not ask me for Duet support via PM or email, use the forum
                                          http://www.escher3d.com, https://miscsolutions.wordpress.com

                                          Hoops40undefined 1 Reply Last reply Reply Quote 0
                                          • Hoops40undefined
                                            Hoops40 @dc42
                                            last edited by

                                            @dc42 was wonder if there is a way to implement a trigger function. This might allow independent z axis.
                                            I'm not a programmer so probably asking a stupid question.
                                            Thinking if each head has trigger for layer completion to tell the system to send next line of commands to specific head.
                                            Mechanical or digital not sure which would be best.
                                            Sorry if it's a stupid question.